Location: 104, Hannam-daero, Yongsan-gu, Seoul, Korea
Use: Office
Site area: 433.00㎡
Building area: 244.73㎡
Gross floor area: 1,315.53㎡
Building coverage: 56.52% 
Floor space index: 196.10% 
Building scope: B2, 5F
Structure: RC 
Parking: 12
Design period: 2012.09 ~ 2013.01(Architecture), 2013.11 ~ 2014.01(Interior)
Construction period 2013.05 ~ 2014.03
Structural engineer: THE KUJO Co., Ltd
Mechanical engineer: HANA Consulting Engineers Co., Ltd 
Electrical engineer: HANA Consulting Engineers Co., Ltd 
Construction: Geo Hyun Construction Co.,Ltd(Architecture), Kumkang enterprises Co., Ltd(Interior)
Client: HANDS CORPORATION Ltd
Design: Chanjoong Kim 
Design team: Choonglyeol Lee, Sanghyun Park, Jongkil Kim, Jinchul Choi

 

 